Member Login / Register

Twinsburg Family Health and Surgery Center

Project
Overview

Westlake Reed Leskosky master planned and designed the multi-phase development of an award winning new 80-acre suburban medical campus. The first two phases encompass a 160,000 sf Family Health Center and 304,000 sf complex comprised of an Emergency Department, Ambulatory Surgery Center and 140-bed hospital. A third phase is planned for an additional bed tower with outparcels for specific areas of care. The design challenge involved issues of image, significant topographic changes from one side... more

Westlake Reed Leskosky master planned and designed the multi-phase development of an award winning new 80-acre suburban medical campus. The first two phases encompass a 160,000 sf Family Health Center and 304,000 sf complex comprised of an Emergency Department, Ambulatory Surgery Center and 140-bed hospital. A third phase is planned for an additional bed tower with outparcels for specific areas of care. The design challenge involved issues of image, significant topographic changes from one side of the site to the other, and preserving and managing existing wetlands. Westlake Reed Leskosky's solution created a building that is completely integrated with its landscape while providing an important image for the Cleveland Clinic. less

Team

Business Owner
Cleveland Clinic

Contractor
Turner

Designer
Westlake Reed Leskosky

Structure
Details

Location

Twinsburg, OH
(ASHRAE Zone 5A)

Square Footage

190,260 (gross)
0 (net)

Project Cost

$96 M

Resource
Usage

Site Use Intensity

98.1 kBTU/yr-gsf (estimated)

Graph

Source Use Intensity

199 kBTU/yr-gsf (estimated)

Renewable Energy Production

None (estimated)

Space Heating

11608.6 MMBTU (baseline)
9230.4 MMBTU (proposed)

Space Cooling

2514.2 MMBTU (baseline)
1373.6 MMBTU (proposed)

Heat Rejection

161.2 MMBTU (baseline)
143.2 MMBTU (proposed)

Lighting

1928.4 MMBTU (baseline)
1044.9 MMBTU (proposed)

Fans/Pumps

2831.8 MMTBU (baseline)
3032.3 MMBTU (proposed)

Receptacles

2055.5 MMBTU (baseline)
2055.5 MMBTU (proposed)

Water Collection

N/A (baseline)

Water Use

787.8 kGallons (baseline)
523.1 kGallons (proposed)

Expand

The Cleveland Clinic operates one of the largest healthcare building portfolios in the country, requiring a balanced approach to system design. Products used must have a proven track-record and not be overly complex to maintain. The Twinsburg Clinic project is featured as a case study in the latest ASHRAE Advanced Energy Design Guide for Healthcare. It was the first major project to achieve LEED-NC Gold in the Clinic system.

Industry
Rankings

Green Building

LEED-NC v2.2 Gold

ENERGY STAR Score

77 (anticipated)

Improvement

24.6%, ASHRAE 90.1-2004

Related Blogs News and Documents

Recool launch

December 10, 2012 am31 12:00 am